Originally developed A-PICS kanban system operates in combination with the Aoyama rotary rack system, and ensures accurate delivery of the products to the customers. This production control system realizes minimization of stock as well as shortening the lead time by manufacturing necessary products at a point where they become necessary based on the just-in-time philosophy.


Copyright (C) 2008 Aoyama Seisakusho Co., Ltd. All rights reserved.